Eastern Uganda
Borehole drilling in Pallisa
Pallisa was the site of our first contract with the Ugandan government, four new boreholes drilled and completed in November 2013. The district is densely settled and largely agricultural, which puts sustained pressure on every functioning water point.
Photo: Mozerayayena, a hand pump borehole in daily use, Uganda. CC BY-SA 4.0, via Wikimedia Commons.
Hydrogeology and what it means for your well
Eastern Uganda around Pallisa combines basement rock with areas of thicker superficial deposits and seasonally waterlogged ground. Shallow water is often present but frequently contaminated by dense settlement and livestock, so the sanitary seal and apron works carry more weight here than almost anywhere else we drill.
What we have delivered here
The four-borehole government contract in Pallisa demonstrated the team could deliver to public sector reporting requirements: completion reports, coordinates, water quality results and photographic records, all in the format the district water office needed for its asset register.
- Four government boreholes, Pallisa — Pallisa District, Uganda. Client: Government of Uganda.
Access, mobilisation and scheduling
Pallisa is a longer mobilisation from our northern bases, which makes clustering essential. Programmes of several boreholes in the district, or contracts combining new drilling with rehabilitation of existing wells, are far more cost-effective than isolated single wells.
Services available in Pallisa
The full range is available wherever the rig mobilises: siting, drilling, well construction and pump installation, plus rehabilitation of existing water points.
- Borehole Drilling — Air-rotary water wells from 100 mm to 1000 mm diameter, to depths of 450 metres.
- Hydrogeological Surveying — Professional geologists and surveyors run pre-drilling siting and post-drilling analysis.
- Casing and Well Construction — Casing, gravel packing, grouting, development and concrete apron casting.
- Hand Pump Installation — U2, U3 and India Mark II hand pump supply, installation and commissioning.
Planning a programme in Pallisa?
Clustering several water points into one mobilisation is the single most effective way to reduce cost per borehole in this district. Tell us how many sites you have and we will come back with a schedule and a line-item estimate.