Borehole drilling in Kiryandongo

Kiryandongo hosts one of Uganda’s large refugee settlements, and water demand there is both high and concentrated. We completed four boreholes for Global H2O in December 2014, and Kiryandongo formed part of the contract to drill twenty boreholes and construct twelve pit latrines in refugee settlements.

Photo: Ronaldladu john, tap stands in Rhino Camp refugee settlement, Uganda. CC BY-SA 4.0, via Wikimedia Commons.

Hydrogeology and what it means for your well

The district lies towards the Albertine Rift margin, where the geology is more varied than in the Acholi basement: basement rock in places, and thicker sedimentary and superficial cover elsewhere. That variety makes the desk study, and above all the records of nearby existing boreholes, especially valuable at the siting stage.

What we have delivered here

Settlement work has its own requirements: very high usage per water point, the need to combine water supply with sanitation infrastructure, and coordination with settlement management and other implementing partners. Our contract here combined borehole drilling with pit latrine construction for exactly that reason.

  • 20 boreholes and 12 pit latrines in refugee settlements — Kiryandongo and Kamwenge, Uganda. Client: Refugee settlement programme.
  • Four boreholes, Kiryandongo — Kiryandongo District, Uganda. Client: Global H2O.

Access, mobilisation and scheduling

Kiryandongo sits on the main route north, which makes it accessible from Kampala and from our Gulu base. Road access is generally good, and the concentration of demand within the settlement keeps mobilisation cost per water point low.

Services available in Kiryandongo

The full range is available wherever the rig mobilises: siting, drilling, well construction and pump installation, plus rehabilitation of existing water points.

Planning a programme in Kiryandongo?

Clustering several water points into one mobilisation is the single most effective way to reduce cost per borehole in this district. Tell us how many sites you have and we will come back with a schedule and a line-item estimate.