Acholi sub-region, Northern Uganda
Borehole drilling in Gulu
Gulu is the commercial hub of northern Uganda and our second operating base. Demand here spans the full range: community hand pump wells in the rural sub-counties, higher-yield institutional wells for schools and health centres, and commercial supply for businesses and farms around the city.
Photo: Amuzujoe, a hand pump and apron at an institutional water point. CC BY-SA 4.0, via Wikimedia Commons.
Hydrogeology and what it means for your well
The district lies on crystalline basement with a weathered mantle that is locally thick, which sometimes allows shallower completions than elsewhere in Acholi. Even so, wells intended to serve year-round demand are normally taken into fractured fresh rock, and the overburden section cased and grouted off to protect against surface contamination.
What we have delivered here
From Gulu we serve institutional clients needing sustained yield rather than a hand pump: schools, health centres and trading centres where a solar submersible system with a raised tank and tap stands is often the better answer. We also carry out rehabilitation of older water points across the district.
Access, mobilisation and scheduling
Gulu offers good road access in most directions, reliable fuel and supply, and proximity to the main routes north and east. That makes it an efficient staging point for programmes across Acholi and into Lango, and it keeps mobilisation costs down for multi-district contracts.
Services available in Gulu
The full range is available wherever the rig mobilises: siting, drilling, well construction and pump installation, plus rehabilitation of existing water points.
- Borehole Drilling — Air-rotary water wells from 100 mm to 1000 mm diameter, to depths of 450 metres.
- Hydrogeological Surveying — Professional geologists and surveyors run pre-drilling siting and post-drilling analysis.
- Casing and Well Construction — Casing, gravel packing, grouting, development and concrete apron casting.
- Hand Pump Installation — U2, U3 and India Mark II hand pump supply, installation and commissioning.
Planning a programme in Gulu?
Clustering several water points into one mobilisation is the single most effective way to reduce cost per borehole in this district. Tell us how many sites you have and we will come back with a schedule and a line-item estimate.