Borehole drilling in Kitgum

Kitgum is where Sub Saharan Drilling has worked longest and drilled most. Our crews have completed boreholes across the district for Global H2O and for district government programmes, and the town remains one of our two operating bases in the north.

Photo: Oxfam East Africa, drilling for clean water in Upper Nile, South Sudan. CC BY 2.0, via Wikimedia Commons.

Hydrogeology and what it means for your well

Kitgum lies on Precambrian crystalline basement, mostly granitic gneiss with local schist belts. Groundwater is held in the weathered regolith and in fracture zones cutting the fresh rock beneath it. Depth to fresh rock varies sharply over short distances, which makes geophysical siting the decisive step: neighbouring points can differ by 40 metres in the depth at which a productive fracture is intersected.

What we have delivered here

Work in Kitgum has included new community boreholes for Global H2O in 2013 and 2014, wells drilled under district government contracts, and rehabilitation of existing hand pump water points. Completion reports, GPS coordinates and site photographs from these projects were accepted by the client and are available as references on request.

  • Two boreholes, Kitgum — Kitgum District, Uganda. Client: Global H2O.
  • Five boreholes, Kitgum District — Kitgum District, Uganda. Client: Global H2O UK, Germany and USA.
  • Seven boreholes, Kitgum and Lamwo — Kitgum and Lamwo Districts, Uganda. Client: Global H2O Deutschland e.V.

Access, mobilisation and scheduling

With a base in Kitgum town, mobilisation costs to sites across the district and into neighbouring Lamwo and Pader are low, and crews can reach most parishes within a day. Access is the main seasonal constraint: some sub-counties become difficult for a heavy rig during the peak of the rains, so programmes are best scheduled with that in mind.

Services available in Kitgum

The full range is available wherever the rig mobilises: siting, drilling, well construction and pump installation, plus rehabilitation of existing water points.

Planning a programme in Kitgum?

Clustering several water points into one mobilisation is the single most effective way to reduce cost per borehole in this district. Tell us how many sites you have and we will come back with a schedule and a line-item estimate.