Borehole drilling across Sub Saharan Africa since 2013
Sub Saharan Drilling

Acholi sub-region, Northern Uganda

Borehole drilling in Lamwo

Lamwo has been the site of some of our largest single programmes, including a twelve-borehole water project for Global H2O. The district combines dispersed rural parishes with refugee-hosting sub-counties near the South Sudan border, and both create sustained demand for reliable water points.

Photo: Moses Elly, a borehole in the Bidibidi refugee settlement, Uganda. CC BY-SA 4.0, via Wikimedia Commons.

Hydrogeology and what it means for your well

Lamwo sits on the same crystalline basement as the rest of Acholi, with granitic gneiss dominating and local variation in the thickness of the weathered mantle. Productive wells generally depend on intersecting a fracture in the fresh rock rather than on the overburden alone, since overburden water in this setting tends to fail at the end of a long dry season.

What we have delivered here

Our projects in Lamwo include the twelve-borehole programme for Global H2O and boreholes drilled alongside our Kitgum work in the same mobilisations. Working across the two districts in a single deployment has consistently reduced the cost per water point for our clients.

  • Twelve borehole programme, Lamwo — Lamwo District, Uganda. Client: Global H2O.
  • Seven boreholes, Kitgum and Lamwo — Kitgum and Lamwo Districts, Uganda. Client: Global H2O Deutschland e.V.

Access, mobilisation and scheduling

Lamwo is reached from our Kitgum base, which keeps mobilisation efficient. Remote parishes towards the border require longer water bowser runs and careful access planning, both of which are priced explicitly rather than hidden in a lump sum.

Services available in Lamwo

The full range is available wherever the rig mobilises: siting, drilling, well construction and pump installation, plus rehabilitation of existing water points.

Planning a programme in Lamwo?

Clustering several water points into one mobilisation is the single most effective way to reduce cost per borehole in this district. Tell us how many sites you have and we will come back with a schedule and a line-item estimate.

Request a quote

Planning a water project?

Tell us the district, the number of water points and the timeline. We reply with a free, no-obligation estimate and a siting plan.