Western Uganda
Borehole drilling in Kamwenge and Rwamwanja
Kamwenge District and the Rwamwanja refugee settlement have been the focus of our western Uganda work. We completed a borehole at Rwamwanja for Pastor Salomon Mwesige with Stop Hunger Now and Feed the Hungry, and Kamwenge formed part of the twenty-borehole and twelve-latrine settlement contract.
Photo: Gizvula27, hand pump installation, Uganda. CC BY-SA 4.0, via Wikimedia Commons.
Hydrogeology and what it means for your well
Western Uganda presents a more varied hydrogeology than the northern basement: basement rock, rift-related sediments and volcanic influence all occur within relatively short distances. Expected depths and water chemistry therefore vary more, and water quality testing carries correspondingly more weight before handover.
What we have delivered here
Settlement and host community work in Kamwenge means designing for high usage and for the tension that arises when a settlement water point is better than the one the host community uses. Where a programme allows it, serving both populations from the same investment is the more durable outcome.
- Rwamwanja borehole — Rwamwanja, Kamwenge District, Uganda. Client: Stop Hunger Now / Feed the Hungry.
- 20 boreholes and 12 pit latrines in refugee settlements — Kiryandongo and Kamwenge, Uganda. Client: Refugee settlement programme.
Access, mobilisation and scheduling
Kamwenge is our furthest regular working area from the northern bases, so mobilisation is priced for the distance and programmes are clustered. Combining Rwamwanja and Kiryandongo work in one deployment has previously been the efficient approach.
Services available in Kamwenge and Rwamwanja
The full range is available wherever the rig mobilises: siting, drilling, well construction and pump installation, plus rehabilitation of existing water points.
- Borehole Drilling — Air-rotary water wells from 100 mm to 1000 mm diameter, to depths of 450 metres.
- Hydrogeological Surveying — Professional geologists and surveyors run pre-drilling siting and post-drilling analysis.
- Casing and Well Construction — Casing, gravel packing, grouting, development and concrete apron casting.
- Hand Pump Installation — U2, U3 and India Mark II hand pump supply, installation and commissioning.
Planning a programme in Kamwenge and Rwamwanja?
Clustering several water points into one mobilisation is the single most effective way to reduce cost per borehole in this district. Tell us how many sites you have and we will come back with a schedule and a line-item estimate.